Skip to main content
Free tool · for trainers and L&D

What does your next training program really cost to build?

Compare building in-house, hiring a freelance instructional designer, and generating the kit — per program and per year. Move the sliders; the numbers update as you go. No signup needed.

Your numbers
hrs

Hours of live, instructor-led delivery

New or substantially rebuilt programs

hrs

Industry rule of thumb for ILT: ~22–82, ~40 typical

$/hr

Salary + benefits + overhead of whoever builds it

$/hr

Typical US range $50–$150/hr

hrs

Per program, when someone else drafts it

Estimated savings vs building in-house
$32,492/ YEAR

and about 616 hours of design time back, across 4 programs a year.

ApproachPer programPer year
Build it in-house160 hrs of your team's time$8,800$35,200
Hire a freelance designerTheir hours at $75/hr + your review$12,330$49,320
InstructorKit Pro Kit$347 + 6 hrs of your review$677$2,708

Estimates for a planning conversation, not a quote. Freelancer savings: $46,612 / year.

Save your result

Email me a copy to share with my manager.

You’ll get this breakdown plus a link that reopens the calculator with your numbers filled in.

No more than monthly. Unsubscribe in one click. We never sell your address. Privacy

…or skip the build entirely.

A Pro Kit generates the whole program — Student Manual, Instructor Guide, Slide Deck and nine supporting documents — for $347, yours to keep.

How the estimate works

Every approach pays for the same thing: development hours per hour of delivered training. Rules of thumb for instructor-led training put that somewhere between 22 and 82 hours, with around 40 typical — the widely cited Chapman Alliance figure for ILT is 43:1. A four-hour workshop is therefore roughly 160 hours of design and writing.

In-house multiplies those hours by your loaded hourly cost. A freelancer bills the same hours at their rate, plus your time briefing and reviewing. A Pro Kit replaces the drafting with a fixed $347 plus the hours you spend reviewing and tailoring what it produces.

It leaves out costs that vary too much to model — subject-matter expert time, pilot sessions, printing, translation — so treat it as the start of a budgeting conversation, not a quote. For the full breakdown of all six ways to build a program, read how much it costs to create a training program.